You don't have javascript enabled. Good luck with that.
Pencarian
Selain menimbulkan suara bising, penggalian sodetan yang menggunakan alat berat menimbulkan getaran
Warga RW 04 dan 05 Cipinang Cempedak, Jatinegara, Jakarta Timur mengeluhkan proyek sodetan Kali Ciliwung ke Kanal Banjir Timur di Jalan Otista III. .
photo istimewa - Beritajakarta.id

Residents Complained of Ciliwung River Waterway Construction

Residents of RW 04 and 05 Cipinang Cempedak, Jatinegara, East Jakarta complained of Ciliwung River Waterway Project Construction to East Flood Channel (KBT) on Jalan Otista III. Besides creating noisy sound, waterway excavation project which using heavy equipment shaking ground much and it creates crack on resident’s house floor. Vivi (37), a resident of RT 01 RW 05 said so.

My house is often shaking like there is an earthquake and its floors are cracked

“My house is often shaking like there is an earthquake and its floors are cracked. The project distance is only 5 meters away,” Vivi complained, Wednesday (5/28).

Anita (31), a resident of RT 01 RW 04 said, during the project, residents’ groundwater becomes muddy and cannot be consumed. As an effect, residents have to buy clean water from water peddler.

25 Illegal Shacks on Ciliwung Riverbank Demolished

“Residents already complained and show its photograph to contractor, but there is no satisfying answer until now. The contractor has to be responsible,” she asserted.

Residents are complained because PT Wika as the contractor did not act transparency to conduct socialization. Start from construction time, technical, and effect. Because, the project was informed to be finished at 7 PM. But in fact the construction is sill continued until 10 PM. Besides that, Jalan Otista III which was closed only for a line, now two lanes are closed. It is deeply troubled resident’s activities.

PT Wika secretary, Natal Argawan admitted that he did not know about residents protest related this project. But he promised will deliver residents complain to manager construction who directly handle the project.

“We will deliver residents complain to team project who directly handle it. Because I did not know about the problem on the field,” he said.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1039 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye904 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye545 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye447 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing